ASB Valiant successfully delivered a 13.02MW dual-fuel gas turbine power plant for Dangote Cement Plc in Ibese, Ogun State. This project was designed to provide a stable and efficient power supply to support the cement production process, ensuring uninterrupted operations and optimal energy efficiency.

Features of Project

Dual-Fuel Technology
High Energy Efficiency
Reliable Power Generation
Advanced Control Systems
Scalable Power Solution
Reduced Environmental Impact
portfolio-single-col-img2

Working Process

01
Step

Engineering and Design

Development of a customized power solution tailored to the cement plant’s energy needs.
02
Step

Procurement

Sourcing high-efficiency dual-fuel gas turbines and necessary equipment.
03
Step

Construction & Installation

Building the power plant infrastructure and integrating key systems.
04
Step

Commissioning & Testing

Rigorous performance testing to ensure efficiency and reliability.

Outcome

The completion of the 13.02MW power plant has significantly enhanced Dangote Cement Plc’s production capabilities in Ibese by ensuring a reliable, cost-effective, and sustainable energy supply. ASB Valiant’s expertise in power generation and engineering solutions played a critical role in delivering a high-performance energy infrastructure that supports industrial growth.

Project Information

client

Dangote Cement Plc

category

Gas Turbine

LOCATION

Ibese, Ogun State, Nigeria

YEAR

2011

status

Completed

Social Links

Follow us on:

Have a
project in
mind?