RCCG 25MW Power Plant

RCCG 25MW Power Plant (Dual Fuel Gas Turbine)

ASB Valiant successfully executed the design, engineering, and construction of a 25MW dual-fuel gas turbine power plant for the Redeemed Christian Church of God (RCCG) at their Redemption Camp in Ogun State, Nigeria. The project was completed in three phases over the years 2010, 2012, and 2015, aligning with the growing energy demands of the camp.

Features of Project

Dual-Fuel Capability
Scalable Implementation
High Efficiency
Reliability & Stability
Advanced Control Systems
Sustainable Power Solution
portfolio-single-col-img2

Working Process

01
Step

Engineering and Design

Comprehensive power plant planning with dual-fuel integration.
02
Step

Procurement

Sourcing of high-efficiency gas turbines and supporting systems.
03
Step

Construction & Installation

Building plant infrastructure and integrating power systems.
04
Step

Commissioning & Testing

Ensuring seamless operation and efficiency.

Outcome

The 25MW dual-fuel power plant has significantly enhanced RCCG Redemption Camp's power infrastructure, ensuring a stable energy supply for its religious, residential and commercial operations. ASB Valiant's expertise in engineering and energy solutions has delivered a reliable and scalable power generation system that supports the long-term growth of the camp. 

Project Information

client

RCCG

category

Turnkey Power Plant

LOCATION

RCCG Redemption Camp, Ogun State, Nigeria

YEAR

2010, 2012, 2015

status

Completed

Social Links

Follow us on:

Have a
project in
mind?